-- card: 100039 from stack: in -- bmap block id: 0 -- flags: 0000 -- background id: 3633 -- name: With Planned Dates -- part 22 (field) -- low flags: 01 -- high flags: 0000 -- rect: left=241 top=56 right=84 bottom=463 -- title width / last selected line: 0 -- icon id / first selected line: 0 / 0 -- text alignment: 0 -- font id: 3 -- text size: 10 -- style flags: 256 -- line height: 13 -- part name: subhead -- part 25 (field) -- low flags: 01 -- high flags: 0002 -- rect: left=409 top=260 right=275 bottom=464 -- title width / last selected line: 0 -- icon id / first selected line: 0 / 0 -- text alignment: 1 -- font id: 3 -- text size: 10 -- style flags: 0 -- line height: 13 -- part name: pagexofy -- part 27 (button) -- low flags: 00 -- high flags: A003 -- rect: left=15 top=201 right=222 bottom=210 -- title width / last selected line: 0 -- icon id / first selected line: 0 / 0 -- text alignment: 1 -- font id: 3 -- text size: 10 -- style flags: 0 -- line height: 13 -- part name: Calculating Project Dates ----- HyperTalk script ----- on mouseUp go card id 91353 end mouseUp -- part contents for background part 6 ----- text ----- MacProject II is preset to calculate elements of the project’s schedule with the planned dates. Important: This type of calculation is most suitable for planning a project and for periodically comparing the planned schedule to the real project as it progresses. But for most project monitoring, you should calculate with actual dates. -- part contents for background part 7 ----- text ----- Choose Calculate Using Planned from the Dates menu. For calculating late dates with planned dates, MacProject II assigns the last task’s Earliest Finish to be its Latest Finish and takes a backward pass through the schedule to determine the rest of the late dates. -- part contents for background part 27 ----- text ----- Recalculating the Schedule -- part contents for background part 28 ----- text ----- With Planned Dates -- part contents for card part 22 ----- text ----- To change to calculation with planned dates: -- part contents for card part 25 ----- text ----- 1 of 2